top of page
PASCAL FERREIRA architect
Villejuif Louis Aragon metro station
Villejuif, France
Delivery: On going
Function: Technical spaces / Travel public spaces / Connexion with the existant metro ligne 7 / Shops
Surface area: 8 000 m²
Construction costs: 40 million euros (excl. tax)
Contract: Public
Mission: Construction site management in CD phase
Control of execution plans / Execution control / Administration economic and finance gestion / Team mangement
Period: November 2022 until today
Duration: On going
General contractor: Société des Grands Projets for Grand Paris Express
Groupement: Setec TPI, Pierre-Loïc Veyron (Project leader) and Philippe Gazeau & Associates, Romain Bergerault (Project manger)
Engineering offices: Setec (Structure, network & Environement), Cosil (Lighting), AVLS (Acoustician), PGA (Facades)
Info
bottom of page